翻訳と辞書 |
Beach Monorail Station : ウィキペディア英語版 | Sentosa Express
Sentosa Express () is a monorail line connecting Sentosa island to HarbourFront on the Singapore mainland across the waters. Built at a cost of S$140 million, development started in June 2003 and was completed in December 2006.〔http://www.sentosa.com.sg/about_us/press_releases/press_release20061204_factsheet.html〕 The fully elevated 2.1-kilometre (1.3-mile; per direction) two-way line (4.3-km total track length) and three out of four stations opened on 15 January 2007.〔 The fourth station, Waterfront, opened on 1 February 2010.〔http://www.businesstimes.com.sg/sub/storyprintfriendly/0,4582,370675,00.html〕 The monorail system, privately owned and operated by Sentosa Development Corporation, can move up to 4,000 passengers per hour per direction.〔http://www.sentosa.com.sg/UserFiles/File/SDCFlatFee.pdf〕 ==Train timings== The daily first and last train timings of both Sentosa and Beach termini are 07:00 and 00:00 hours.〔http://www.sentosa.com.sg/useful_info/sentosa_express.html〕 Trains run at an average frequency of three minutes during peak hours.〔 The entire route, from one terminus to the other, takes eight minutes.〔
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sentosa Express」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|